Askaripoor, T., Kazemi, E., & Marzban, M. (2020). Fire Risk Assessment and Evaluation of the Effectiveness of Fire Protection Actions in a Combined-Cycle Power Plant, Iranian Journal of Health. Safety & Environment, 7 (1), 1413-1420.
Borgheipour. H., Monazami Tehrani, G., Abbaszadeh Tehrani, N., Nasiri Lomer, S., Nekooei Esfahani, A, & Mohammadfam, I. (2019). Health Safety and Environmental Hazards of the Chlorination Unit of Combined Cycle Power Plants by Using HAZOP and Bow-Tie Methods. ohhp; 3 (2) :134-145 [In Persian]. http://ohhp.ssu.ac.ir/article-1-200-fa.html
Celik, E., & Gul, M. (2021). Hazard identification, risk assessment and control for dam construction safety using an integrated BWM and MARCOS approach under interval type-2 fuzzy sets environment. Automation in Construction 127: 103699.
Darvishi, S., Jozi, S. A., Malmasi, S., & Rezaian, S. (2019). Introduction of a new model for assessing the environmental risk of dams during construction using EFMEA and VIKOR combination methods (case study of the Balarood Dam in Khuzestan. MJSP; 23(4) :37-61[In Persian].
http://hsmsp.modares.ac.ir/article-21-27714-fa.html
Ebadzadeh, F., Monavari, S. M., Jozi, S. A., Robati, M., & Rahimi, R. (2023). Assessing the Health, Safety and Environmental Risk of Ammonia and Urea Units Using the Integration of Shannon Entropy and WASPAS Based on Fuzzy Logic. Human and Environment, No. 63. 165-177 [In Persian].
Ebadzadeh, F., Monavari, S. M., Jozi, S. A., Robati, M., & Rahimi, R. (2023). An integrated of fuzzy-WASPAS and E-FMEA methods for environmental risk assessment: a case study of petrochemical industry, Iran. Environmental Science and Pollution Research, 30(14), 40315-40326.
El-Araby, A. (2023). The utilization of MARCOS method for different engineering applications: a comparative study.International journal of research in industrial engineering, 12(2), 155-164.
Ghosh, A., Chakraborty, P. S., & Balakannan, K. (2023). Environmental Impact Assessment from the Emission of Combined Natural Gas Cycle Power Plant. Sustainability, Agri, Food and Environmental Research, 11.
Heller, S. (2006). Managing industrial risk-having a tasted and proven system to prevent and assess risk. J. Hazard Mater., 130(1-2):58-63. DOI: 10.22034/GJESM.2016.02.04.004.
Jozi, S.A., & Saffarian, Sh. (2011). Environmental risk analysis of Abadan gas power plant using TOPSIS method. Journal of environmental studies, 37(58), 53-66 [In Persian]. https://sid.ir/paper/2838/en
Kakaei, H., Jafari Nodoushan, R., Kamalvandi, M., Azad, P., Normohammadi, P., & Kakaei, Z. (2015). Identification and Classification of Risks and Potential Events by using Preliminary Hazard Analysis Method (PHA) in Kermanshah Oil Refinery. jehe; 3 (1), p.1-9 [In Persian]. http://jehe.abzums.ac.ir/article-1-196-fa.html.
Khodadadi-Karimvand, M., & Shirouyehzad, H. (2021). Well drilling fuzzy risk assessment using fuzzy FMEA and fuzzy TOPSIS. Journal of Fuzzy Extension and Applications, 2(2), 144-155.
Krejcie, R. V., & Morgan, D. W. 1970. Determining sample size for research activities. Educational and psychological measurement, 30(3), 607-610.
Momayez, A., & Qassemi, S. A. (2019). Environmental impact assessment (EIA) of south PARS special zone (ASSALOOYEH) in creating a stable environmental using the LEOPOLD matrix.
Morales-Torres, A., Serrano-Lombillo, A., Escuder-Bueno, I., & Altarejos- García, L. (2016). The suitability of risk reduction indicators to inform dam safety management. Structure and infrastructure engineering: Maintenance management, life cycle design and performance, 1465-1476. DOI:10.1080/15732479.2015.1136830.
Morris, P., & Therivel, R. (2009). Methods of Environmental Impact Assessment (Natural and Built Environment Series) 3rd Edition. London, Imprint: Routledge. 577. https: //doi.org/10.4324/9780203892909.
Mousavi, S., Sotoude, A., & Azamizadeh, H. (2017). Environmental risk assessment of Yazd combined cycle power plant by William Fine method. The 4th Conference on Environmental Planning and Management, Tehran. [In Persian]. https://civilica.com/doc/589782
Nesari Ardakani, M., Morovati, M., Arsalan, M., & Siyahati Ardakani, G. (2021). Environmental Risk Assessment of Non-Metallic Industries Using Combined PHA-William Fine Technique (Case Study: Eram Ardakan Tile & Ceramic IND Co.). Journal of Environmental Health Enginering, 8(2), 196-211. [In Persian].
Noori, H., Cheraghi, M., & Eslami Baladeh, A. 2019. A hybrid fuzzy MADM model for environmental risk assessment: a case of an oil and gas exploitation area. J Health Saf Work. 2019; 9 (3), p. 200-21[In Persian]. http://jhsw.tums.ac.ir/article-1-6166-fa.html.
Pyramoon Consulting Co. (2016). Environmental assessment of Qeshm combined cycle power plant [In Persian].
Shirali, G., Askaripoor, T., Kazemi, E., Zohoorian Azad, E., & Marzban, M. (2014). Assessment and risks ranking in a combined cycle power plant using degree of Belief approach in fuzzy logic. ioh; 11 (5):20-29 [In Persian]. http://ioh.iums.ac.ir/article-1-1159-fa.html
Stević, Ž., Pamučar, D., Puška, A., & Chatterjee, P. (2020). Sustainable supplier selection in healthcare industries using a new MCDM method: Measurement of alternatives and ranking according to COmpromise solution (MARCOS). Computers & Industrial Engineering, 140, 106231.
Suter, G. W., Barnthouse, L. W., & O'Neill, R. V. (1987). Treatment of risk in environmental impact assessment. J Environ Manage. 11(3):295-303. https://doi.org/10.1007/BF0186 7157.
Tenney, A., Kværner, J., & Gjerstad, K. I. (2006). Uncertainty in environmental impact assessment predictions: the need for better communication and more transparency. Impact Assessment and Project Appraisal; 24(1): 45-56. https://doi.org/10.3152/147154606781765345
Torab, S., & Dashti, S. (2022). Risk Assessment of Health Safety and Environmental of Samangan Combined Cycle Power Plant using FMEA&SAW Integrated Model. Iranian Dam and Hydroelectric Powerplant; 8 (31):16-28 [In Persian]. http://journal.hydropower.org.ir/article-1-461-fa.html
Wang, Y., Tian, M., Wang, D., Zhao, Q., Shan, S., & Lin, S. (2012). Study on the HSE Management at Construction Site of Oil and Gas Processing Area. Procedia Engineering, 45, 231-234.
Wood, C., Dipper, B., & Jones, C. 2000. Auditing the assessment of the environmental impacts of planning projects. Journal of Environmental Planning and Management; 43(1): 23-47. https://doi.org/10.1080/09640560010757
Yu, J., Hongyu, D., Yang, Y., Shibo, W., Qingze, Z., & Ya, X. (2024). Risk assessment of liquefied natural gas storage tank leakage using failure mode and effects analysis with Fermatean fuzzy sets and CoCoSo method. Applied Soft Computing. 154. 111334.